Frequently Asked Questions

What is Title 24 acceptance testing?

Title 24 Acceptance Testing is the inspection of a project’s lighting control system and state submission of an Acceptance Testing report by a certified Acceptance Testing Contractor and Technician.

i need a certified third party, can you help me?

Yes! You came to the right place. 3rd Party Title 24 inspections are what we specialize in, having gained the reputation as one of the leading experts in the industry.

do you SERVICE my job site’s area?

We service the entire state of California.

what will you need from me to get started?

We will need an electronic copy of the drawings to get started. This allows us to review the lighting control layout to make sure it is compliant with the Title 24 Part 6 code. We will also use the drawings to put together a FREE QUOTE for the certification of the project. From there we will await approval of the price and also work to schedule your project as soon as possible.

How much will my project cost?

Each project is priced differently based on the amount and type of lighting controls, as well as, the required forms needed in the acceptance testing report. Once we receive the drawings, we will be able to better answer that question.

what is your typical turnaround?

As long as there are no corrections needed, we will have the report back to you typically within 24 hours of the inspection. This time may vary depending on the size of the project.

how far in advance do you need to get us scheduled?

In most cases, a day or two in advance will get you on the schedule for the day you are requesting. However, we recommend reaching out to us up to a week in advance, to keep your project on track and make sure we can answer any questions or concerns you may have before the inspection.

can you make it to my job site today?

For emergency situations, we can normally make it out to your job site the same day. However, some days we have completely full schedules and may not be able to accommodate the request until the following day.

how long will the inspection take?

The duration of the inspection depends on the size of our project. Out average inspection time is around an hour to an hour and a half.

Will i need to be onsite?

It is recommended that you have a representative on site during the inspection. However, if you cannot be on site that is not a problem. We will just need access to the location, a stamped set of drawings, and the permit for the project. If there are corrections, we will provide them to you via email, text, or phone call.

what will you need from me during the inspection?

We will need a stamped set of drawings and permit information in order to complete the acceptance testing inspection.

Do you accept credit cardS?

Yes, we accept all major credit cards.